The Frederick County Board of Education has approved design proposals for the construction of Blue Heron Elementary School.

The documents included the site plan, building orientation, floor plans, and proposed building elevations for the new school. It is the second phase of a three-phase design process.

The school will sit on a 15-acre site in the Lake Linganore Hamptons West community and will be a partial two-story building. It will have two separate drop-off loops and entrances for cars and school buses as well as a playing field and paved court.

The building will have a capacity of 705 students.

Construction is scheduled to begin in February 2020, with students occupying the building starting in September 2021.

The motion for approval of the documents passed 4-0 with school board member Liz Barrett abstaining. Board President Brad Young and member Jay Mason were absent. The motion also received support from the student member.

Follow Katryna Perera on Twitter: @katrynajill.

(0) comments

Welcome to the discussion.

Keep it clean. Please avoid obscene, vulgar, lewd, racist or sexually-oriented language.
Engage ideas. This forum is for the exchange of ideas, insights and experiences, not personal attacks. Ad hominen criticisms are not allowed. Focus on ideas instead.
TURN OFF CAPS LOCK.
Don't threaten. Threats of harming another person will not be tolerated.
Be truthful. Don't knowingly lie about anyone or anything.
Be nice. No racism, sexism or any sort of -ism that is degrading to another person.
No trolls. Off-topic comments and comments that bait others are not allowed.
No spamming. This is not the place to sell miracle cures.
Say it once. No repeat or repetitive posts, please.
Help us. Use the 'Report' link on each comment to let us know of abusive posts.